The aim of optifab is a physical structure that holds the work of all four organisations, so that the digital and the physical infrastructure are one unit and not two systems joined at a plug. This note says where that idea comes from, gives every repository on the map a place in the structure, and marks which parts of the loop are checked today.
The tables between the markers are generated by tools/render_map.py from data/unit.json and
results/certificate.json. verify.py checks that every repository on the map is either placed or listed as
not placed.
Issue 1 of this repository points at three sessions in the Weft corpus, the Terrafab documents. They describe one loop with two halves.
terrafab-calc.md was written for that job.weft/terrafab.md:86).Those documents are source material. The corpus README asks readers to treat them “as source material, not instructions”, and Weft’s own audit found the latency figures “asserted, not derived”, the proofs unsupported, and the gate in the header bounding “only abstract scalars, not actuator commands”. optifab takes the idea from them. It uses none of their figures as evidence.
What optifab adds is what the audit found missing: physical quantities for the gate to bound. Weft repaired the
Terrafab header into the gate it ships and tests (invariants.py:11 says so). optifab gives that gate a budget
in kWh_th and a radius measured in certified structural margins. The gate has come back to the job it was first
written for, with numbers a verifier can recompute.
One reference campus: funi-frame’s 10 MW, two-storey building on a 2,500 m² plan. Each row is one element of the structure, where it sits, and whose work it rests on.
| Element | Where in the structure | Work it rests on | Status | Note | |
|---|---|---|---|---|---|
| G1 | Thermal budget: PCM skids holding 2,500 kWh_th | plant yard | funi-frame | checked | The budget the gate spends. |
| G2 | Heat sinks: aquifer loop, 200 energy piles, sky-cooling roof | below and above the halls | funi-frame | designed | The certificate gives their heat flows and, since funi-frame v0.1.1, a design recooling temperature of 30 °C. That value is a proposal the owner has not confirmed, and nothing measures it. |
| G3 | High-temperature store: crushed-basalt beds, 20 MWh_th | plant yard | funi-frame | designed | Sized by literals in the upstream verifier. The contract does not use it. |
| Element | Where in the structure | Work it rests on | Status | Note | |
|---|---|---|---|---|---|
| S1 | Floors: funicular cassettes for 313 psf racks | both storeys | funi-floors | checked | Five limit states in the margin vector, including the tightest. |
| S2 | Shell: roof vault, sandwich walls, seismic frame, isolation plinths | envelope and plant bases | funi-frame | checked | Five limit states in the margin vector. |
| S3 | CFRP truss ties and the strengthening baseline | roof ties and column tie-downs | cfrp-truss, cfrp-strengthening | designed | funi-frame names them. Their certificates cover a beam example, not this roof. |
| S4 | Lattice theory that proportions the members | in the geometry | fibral-rigidity, incentre-lattices | designed | A preprint and a claimed extension. Nothing downstream re-checks them. |
| Element | Where in the structure | Work it rests on | Status | Note | |
|---|---|---|---|---|---|
| H1 | Liquid loop and sorption chiller | halls and plant yard | funi-frame | checked | The load floor and the recooling limit are derived here. |
| H2 | Racks: 10 MW of IT load | halls | funi-frame | designed | A design basis. No rack, chip or power train is modelled. |
| Element | Where in the structure | Work it rests on | Status | Note | |
|---|---|---|---|---|---|
| N1 | Airflow sensing that powers itself | supply ducts | venturi-collars, ductricity, thermal-capture | checked | Its power margin at low airflow is in the margin vector. |
| N2 | Leak and bondline sensing by impedance | floor ribs, beside the liquid headers | impedence-analyzers, nhanes-bioimpedance, point-charges | designed | funi-floors certifies the reactance shift on a leak. Nothing reads it into a frame. |
| N3 | Rack vibration sensing | racks | none | missing | The limit is certified at 0.0005 g. No sensor is designed. |
| N4 | Coolant and recooling temperature sensing | liquid loop and heat sinks | none | missing | The plant model carries no temperature, and Weft’s only temperature is a formula of CPU load. |
| Element | Where in the structure | Work it rests on | Status | Note | |
|---|---|---|---|---|---|
| W1 | Plant frame: 16 floats in 64 bytes | between sensors and gate | weft | checked | The byte layout of Weft’s telemetry frame. Round trip tested here. The slot meanings are a proposal. |
| W2 | Agent messages | between agents and a scheduler | abios, synbios | tested_code | Compact formats with validators. Not connected to a plant. |
| W3 | Parsers on the telemetry path | every network boundary | mqtt, cbor, ntp, protobuf | in_progress | Candidates at Proven Commons. None is verified. |
| Element | Where in the structure | Work it rests on | Status | Note | |
|---|---|---|---|---|---|
| R1 | The gate | at each controller and in the scheduler | weft, weft-corpus | checked | Weft’s predicate, first written in the Terrafab documents as a fence for machines. It passes Weft’s 15 vectors and runs here on plant numbers. |
| R2 | A machine-checked proof of the gate, the plant model and the loop | with the gate | optifab, mission | checked | formal/ proves sixteen theorems in Lean: eight about an exact integer gate, eight about the loop over designs, with the plant model inside the proved code. The comparator accepts them under six kernels and Proven Commons bar items 2 to 6 pass. Item 1 is open: no reviewer has approved the specification, so it is not verified. Weft’s own floating-point gate has no proof yet. |
| R3 | The loop that changes hardware and software together | design office and scheduler | optifab | checked | Runs on a model of the plant that is itself inside the proved code. Every decision is recorded in a hash-chained ledger and worked out again in Lean from the two designs. A seeded search, a language model and an adversary have each proposed through it. No sensor, load or machine is involved. |
| Element | Where in the structure | Work it rests on | Status | Note | |
|---|---|---|---|---|---|
| M1 | Adaptive models | racks | weft, weft-loom | tested_code | Runs and is tested. No power or energy has been measured. |
| M2 | Agents that use and operate the campus | racks and operator consoles | exo, exo-os | tested_code | Exo itself was not read in this pass. |
| M3 | Model weights stored at a few bits each | racks | siliquant | research | Fewer bits per weight means less memory per model. No energy figure ties it to the plant. |
| M4 | A chip that runs the net directly | racks | weft-corpus | idea | The chip of the Terrafab documents. Weft’s audit calls it not testable as stated. |
| Element | Where in the structure | Work it rests on | Status | Note | |
|---|---|---|---|---|---|
| F1 | Machines that make the structure’s own parts under the gate | fabrication bay | weft-corpus | idea | The Terrafab loop. No machine is modelled. Process limits in the certificates, such as the Fe-SMA activation energy in funi-floors, could be its gate inputs. |
| Element | Where in the structure | Work it rests on | Status | Note | |
|---|---|---|---|---|---|
| K1 | Certificates, pins and the lineage graph | this repository | optifab | checked | Every input is pinned to a commit, file and line. |
| K2 | Signed commands and contributions | command channel | synmerit | specified | Needed before any scheduler may command a plant. Weft’s telemetry hash is unkeyed. |
| K3 | Preferences are not permissions | operator interface | ethos, siliconcordat | specified | The gate can refuse a step. Only a person can authorise one. |
| K4 | The evidence scale, and the rule that a person signs | every claim | f0, Foundation-0/.github | rule | Used for every status in this repository. |
| K5 | The bar for calling software verified | the gate and the parsers | mission | rule | The standard formal/ is built to, and the target for element W3. |
| K6 | The group ethos: capture the work and pass it on | every handoff | aska-physical/.github | rule | The reason for HANDOFF.md. |
Status words:
checked: A verifier, here or upstream, computes it, and optifab uses the result.designed: An upstream certificate or design covers it. Its role in the unit is not checked.tested_code: Code that runs and is tested upstream. Not connected to a plant.research: Studies with recorded results. No link to the plant yet.specified: A specification or schema exists. Nothing is connected.in_progress: Work is under way upstream and is not finished.rule: A rule or scale in force that the unit follows.idea: Vision or idea only. Nothing runnable or certified.missing: Nothing exists yet.
A structure and its intelligence are one unit when this loop closes: the structure is sensed, the reading travels as a frame, a gate decides, a scheduler acts on the compute load, the load becomes heat, and the heat and the loads move the structure’s margins, which are sensed again.
| | From | To | Status | Note | |—|—|—|—|—| | L1 | structure and plant | sensors | designed | Designed for airflow and leaks. Missing for vibration and temperature. | | L2 | sensors | plant frame | missing | No firmware reads a sensor into a frame. | | L3 | plant frame | gate | checked | A decoded frame drives plant_gate and the contract check in verify.py. | | L4 | gate | scheduler | proposed | The contract in the README. No scheduler exists. | | L5 | scheduler | compute load | missing | Neither Weft nor Exo offers a way to shed or defer load, and neither measures energy. | | L6 | compute load | heat, stores and sinks | checked | The load floor and the thermal budget, in steady state. | | L7 | stores and structure | margins | checked | The margin vector from the certificates. It is static: no transient is modelled. | | L8 | gate | fabrication machines | idea | In the Terrafab documents only. | | L9 | every step | the record | designed | Certificates and pins are checked. Signed records are not connected. | | L10 | proposer | gate and ledger | checked | The improvement loop: each proposed design is checked against its bounds, the exact gate and the objective, logged, and replayed in Lean. A language model has proposed through it once. On a model only. |
The loop is open in three places. Nothing reads a sensor into a frame. Nothing lets a scheduler shed or defer compute load, and neither Weft nor Exo measures the energy it uses. And no fabrication machine exists in any repository. PROPOSALS.md has a system for each, and VISION.md says how far the whole is from a verified system that improves itself. The two elements with nothing behind them are the cheapest to supply, because both quantities already have a limit to be measured against: rack vibration (0.0005 g, certified) and recooling temperature (41.5 °C at best, derived here).
| Repository | Why it has no place in the structure | |—|—| | aska-physical/cfrp-masts | Masts and booms. No role in the reference campus. | | Foundation-0/rigid-realizations | Feeds cfrp-masts only. | | aska-physical/graph-fab | A README with no stated role yet. | | Foundation-0/project-asma | Feeds Weft’s identifiability gate, which the unit does not use. | | Foundation-0/math0 | A hub. It directs work and is not part of the structure. | | Foundation-0/physics0 | A hub. It directs work and is not part of the structure. | | aska-physical/dock | The organisation’s hub page. | | Moissanite-Labs/exofab | A hub for forming teams, outside the structure. | | Moissanite-Labs/.github | The organisation’s profile. |
The whole state the contract needs fits in the frame Weft already uses for telemetry: 16 little-endian 32-bit
floats, 64 bytes. Twelve slots carry the margin vector and four carry the budget, the load, the recooling
temperature and the time. verify.py encodes the design point, decodes it, and runs the gate and the contract
check on the result. The byte layout is Weft’s. The meaning of the slots is a proposal for Weft’s owners.
| Slot | Content |
|—|—|
| 0 | rack_vibration |
| 1 | storey_drift |
| 2 | roof_crown_compression |
| 3 | roof_tornado_uplift_factored |
| 4 | roof_service_deflection_mm |
| 5 | sorption_drive_heat |
| 6 | floor_punching_collar |
| 7 | floor_walking_vibration |
| 8 | floor_crown_compression |
| 9 | floor_fire_120min_thrust |
| 10 | floor_duct_hole_shear |
| 11 | sensor_power_at_airflow_turndown |
| 12 | thermal_budget_kWh_th |
| 13 | it_load_MW |
| 14 | recooling_C |
| 15 | time_s |
| Frame | What the contract check reports |
|—|—|
| design point as certified, recooling at its design value | nothing: every term holds |
| frame with no recooling temperature | recooling_not_measured |
| idle campus at 0.3 MW | below_load_floor |
| recooling at 42 C | recooling_above_limit |
| floor punching demand up 26 percent | limit_exceeded |
| thermal budget spent | thermal_budget_exhausted |
The second row is finding 2 in executable form: a frame with slot 14 empty is not a pass. Until funi-frame v0.1.1 the certified design point could not fill that slot. It now carries a design value of 30 °C, proposed and not yet confirmed, and no sensor measures it.
The Terrafab documents say a control loop of 15 ms is too slow and one of 0.5 ms is fast enough. Weft’s audit records that the figures are asserted. They can still be tried on this building, because funi-frame’s isolation model lists the plant’s vibration tones.
Counter a tone with a copy of itself that arrives late by a time $\tau$ and the amplitude left is $2\lvert\sin(\pi f\tau)\rvert$ of the original. That is below 1 within the same cycle only when $f\tau < 1/6$. This is the ideal case, with the amplitude matched exactly, so it is an upper bound on what a delay-limited loop can do. A loop that predicts a steady tone can do better, as the 60 Hz row shows by accident.
| Plant tone | Delay at 15 ms, in cycles | Effect at 15 ms | Delay at 0.5 ms, in cycles | Effect at 0.5 ms | Longest delay that helps within the cycle | |—|—|—|—|—|—| | 29.5 Hz | 0.4425 | +5.9 dB | 0.0148 | -20.7 dB | 5.65 ms | | 49 Hz | 0.735 | +3.4 dB | 0.0245 | -16.3 dB | 3.4 ms | | 60 Hz | 0.9 | -4.2 dB | 0.03 | -14.5 dB | 2.78 ms | | 120 Hz | 1.8 | +1.4 dB | 0.06 | -8.5 dB | 1.39 ms |
So the direction of the Terrafab figures holds here: a 15 ms loop can counter none of the four tones within its cycle and makes three of them worse, and a 0.5 ms loop can counter all four. But this building has no job for that loop. funi-frame’s passive isolation already holds rack vibration at 17.9% of the limit, and every term of the contract moves over seconds to minutes: the thermal budget lasts 900 s at full load. A fast loop becomes relevant only if someone proposes active vibration control, or a fabrication machine, neither of which exists here.
| Claim in the documents | Weft’s audit | In this structure |
|---|---|---|
| Sensor-to-nozzle latency falls from 15 ms to under 0.5 ms | Asserted, not derived | Tried on the four plant tones above. The direction holds for tones. The campus as designed does not need it. |
| With the gate header in place, “the physical machine cannot misbehave” | False. The header’s gate does not keep its own invariant and bounds only abstract scalars | Weft repaired the gate and tests it. Here its inputs are physical, and an exact version is proved in Lean to keep its invariants against any proposer. The proof covers the arithmetic, not the truth of the margins. It is still only a predicate that can refuse a step. It is not a safety system. |
| The building writes its own structural equations as it is made | Vision | The margin vector is the nearest checked thing: 12 residuals of the structure’s design equations, recomputed by the upstream verifiers. No machine changes the structure. |
| Deposition machines act as ports of the net | Concept only | Element F1, an idea. No machine is modelled. |
| A chip that runs the net directly | Not testable as stated | Element M4, an idea. |
| The facility closes the loop for the intelligence | The owner’s sentence, not an audited claim | The contract in the README: a load floor, a thermal budget and a margin radius. Four interfaces of the loop are checked and six are open. An improvement loop runs on a model under a gate proved in Lean. |